Theuma building has reached its highest point

0 Flares 0 Flares ×

The construction of the new Theuma building in the Netherlands has reached its highest point. This was celebrated on September 6, in the new factory.

The reception started with a speech of mr. Slingerland, director of Slingerland Bouw. After the speech the flags were risen and mr. Doeksen, director of Theuma, made a champagne toast to celebrate the reach of the highest point.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 Flares Twitter 0 Facebook 0 Google+ 0 LinkedIn 0 Email -- 0 Flares ×
Newsletter
Loading...Loading...


Quality certificates